Project Checklist

This form is also available as a PDF: typical-project-checklist.pdf

Items - PROJECT

Estimate $

Actual $

LAND COST

ENGINEERING COSTS

BUILDING PERMITS

BANK FEES

LEGAL EXPENSES

SPECIAL FEES


Items - FOUNDATION

Estimate $

Actual $

FOOTINGS

WALLS

SLAB / FLOOR

DAMP-PROOFING / SEALER

BASEMENT WINDOWS

KNEEWALLS

SILL PLATE (DOUBLE)
LALLY COLUMNS
BULKHEAD
PERIMETER DRAINS
SUMP PUMP
WALL INSULATION
OTHER

Items - ADD-ONS

Estimate $

Actual $

EXTERIOR STAIRS

DECKS

PORCHES

GARAGES (some models)

FINISH UPPER LEVELS
(Capes & Chalets)

FINISH LOWER LEVELS
(Split & Bi-Level homes)

FIREPLACE / STACKS

OTHER

Items - MECHANICALS

Estimate $

Actual $

PLUMBING TIE-INS

HEATING SYSTEM
(boiler, stack, pumps etc.)

HVAC

ELECTRIC TIE-INS
(bulbs, batteries etc.)

HOT WATER HEATER

ALARMS
(fire, CO2 etc.)

CABLE & TELEPHONE

OTHER


Items - MISCELLANEOUS

Estimate $

Actual $

ARRANGE "HOLD AREA"
(if site too small)

TEMPORARY POWER

INSPECTIONS

INSURANCE

DUMPSTER & CLEANUP

APPLIANCES

EQUIPMENT TO MOVE UNITS ON SITE
CANVASS / TARPS
(protect your investment)

Items - SITE

Estimate $

Actual $

CLEARING

BLASTING

EXCAVATION

BACKFILL & GRADE

HAUL OFF MATERIAL

ADDITIONAL MATERIAL

DRIVEWAY
LANDSCAPE
UNDERGROUND UTILITIES
OTHER

Items - UTILITIES

Estimate $

Actual $

CITY WATER OR WELL

CITY SEWER OR SEPTIC

GAS SERVICE

UTILITY POLES

UTILITIES

PERCOLATION TEST

WATER QUALITY TEST
TELEPHONE
CABLE / SATELLITE
OTHER

This portion of your project involves the general completion of your modular units...

(some projects may require additional sub-contractor assistance on-site for completion)

Item - MODULAR HOME

Estimate $

Actual $

COST DELIVERED W/TAX

CRANE & SET

EXTERIOR FINISH WORK

ROOFING

GABLE ENDS

FILLERS

SIDING (if declined)
PAINTING (walls, finish)
ATTACH SHIP LOOSE ITEMS (dormers etc.)
GUTTERS
INTERIOR FINISH WORK
TRIM MATE WALL OPENINGS
TRIM CEILING / WALL AREAS
FINISH STAIRWAYS
BASEMENT STAIRS
BASEMENT INSULATION
RAILS
FLOORING FILLERS
FLOORING (typically done locally)
DRYWALL WORK
INSTALL / COMPLETE MOLDINGS
PAINTING (trim)
OTHER

You must also consider the location of the house on your site and the amount of clear space necessary for the crane and the boxes in the area of the foundation. If your septic system will be in the set area, you must wait until the house has been set, to install the system, otherwise damage to your system will result. Consult with your qualified Hallmark representative before you start any site work.

This listing is presented as a "guide" to assist you during the planning stages. Each project is different and may, or may not require some of the points covered on this guide.