Typical Project Check List...

This form is also available as a PDF: typical-project-checklist.pdf

Items - PROJECT

Estimate $

Actual $

LAND COST

   

ENGINEERING COSTS

   

BUILDING PERMITS

   

BANK FEES

   

LEGAL EXPENSES

   

SPECIAL FEES

   


Items - FOUNDATION

Estimate $

Actual $

FOOTINGS

   

WALLS

   

SLAB / FLOOR

   

DAMP-PROOFING / SEALER

   

BASEMENT WINDOWS

   

KNEEWALLS

   
SILL PLATE (DOUBLE)    
LALLY COLUMNS    
BULKHEAD    
PERIMETER DRAINS    
SUMP PUMP    
WALL INSULATION    
OTHER    


Items - ADD-ONS

Estimate $

Actual $

EXTERIOR STAIRS

   

DECKS

   

PORCHES

   

GARAGES (some models)

   

FINISH UPPER LEVELS
(Capes & Chalets)

   

FINISH LOWER LEVELS
(Split & Bi-Level homes)

   

FIREPLACE / STACKS

   
OTHER    


Items - MECHANICALS

Estimate $

Actual $

PLUMBING TIE-INS

   

HEATING SYSTEM
(boiler, stack, pumps etc.)

   

HVAC

   

ELECTRIC TIE-INS
(bulbs, batteries etc.)

   

HOT WATER HEATER

   

ALARMS
(fire, CO2 etc.)

   
CABLE & TELEPHONE    

OTHER

   


Items - MISCELLANEOUS

Estimate $

Actual $

ARRANGE "HOLD AREA"
(if site too small)

   

TEMPORARY POWER

   

INSPECTIONS

   

INSURANCE

   

DUMPSTER & CLEANUP

   

APPLIANCES

   
EQUIPMENT TO MOVE UNITS ON SITE    
CANVASS / TARPS
(protect your investment)
   


Items - SITE

Estimate $

Actual $

CLEARING

   

BLASTING

   

EXCAVATION

   

BACKFILL & GRADE

   

HAUL OFF MATERIAL

   

ADDITIONAL MATERIAL

   
DRIVEWAY    
LANDSCAPE    
UNDERGROUND UTILITIES    
OTHER    


Items - UTILITIES

Estimate $

Actual $

CITY WATER OR WELL

   

CITY SEWER OR SEPTIC

   

GAS SERVICE

   

UTILITY POLES

   

UTILITIES

   

PERCOLATION TEST

   
WATER QUALITY TEST    
TELEPHONE    
CABLE / SATELLITE    
OTHER    


 

This portion of your project involves the general completion of your modular units...

(some projects may require additional sub-contractor assistance on-site for completion)

Item - MODULAR HOME

Estimate $

Actual $

COST DELIVERED W/TAX

   

CRANE & SET

   

EXTERIOR FINISH WORK

   

ROOFING

   

GABLE ENDS

   

FILLERS

   
SIDING (if declined)    
PAINTING (walls, finish)    
ATTACH SHIP LOOSE ITEMS (dormers etc.)    
GUTTERS    
INTERIOR FINISH WORK    
TRIM MATE WALL OPENINGS    
TRIM CEILING / WALL AREAS    
FINISH STAIRWAYS    
BASEMENT STAIRS    
BASEMENT INSULATION    
RAILS    
FLOORING FILLERS    
FLOORING (typically done locally)    
DRYWALL WORK    
INSTALL / COMPLETE MOLDINGS    
PAINTING (trim)    
OTHER    

You must also consider the location of the house on your site and the amount of clear space necessary for the crane and the boxes in the area of the foundation. If your septic system will be in the set area, you must wait until the house has been set, to install the system, otherwise damage to your system will result. Consult with your qualified Hallmark representative before you start any site work.

This listing is presented as a "guide" to assist you during the planning stages. Each project is different and may, or may not require some of the points covered on this guide.